EV Load Assessment

Master And Licensed Electrician

ElectricalService.ca, a division of A2Z Electric Inc.

EV charger load assessment

Follow a few simple steps using your electricity-provider records. The tool will find the highest-use month, day, and one-hour interval, then prepare a preliminary load calculation for contractor review.

Check your service before installing an EV charger

You will need access to your last 12 months of electricity usage. CSV files can fill the tables automatically; PDF, Excel, or screenshots can be attached as supporting evidence.

  • About 8–12 minutes
  • Your information stays on this WordPress site
  • Final result is always pending contractor review
1

Tell us about the project

Only information needed to assess and follow up on this request is collected.

2

Identify the highest-use month

Let the system find it from 12 monthly totals, or enter it directly if you already know it.

How would you like to enter this information?

MonthUsage (kWh)
3

Identify the highest-use day in the peak month

Let the system find it from daily totals, or enter the date directly if you already know it.

How would you like to enter this information?

DateUsage (kWh)
4

Identify the peak hour on the peak day

Let the system find it from 24 intervals, or enter the known peak hour and value directly.

How would you like to enter this information?

Interval startingUsage (kWh)
5

Service and EV charger

Use the main breaker label. A contractor will verify the conductor and equipment ratings.

6

Review and submit

This is a preliminary calculation. A Licensed Electrical Contractor must review the complete record.

Formula used

((Peak kW × 1000) ÷ 240 V) × 1.25 + EV charging current

Privacy and consent

ElectricalService.ca, a division of A2Z Electric Inc. will collect the contact details, project address, electricity-usage data, electrical-service details, and files you submit to assess EV charging capacity, contact you about this request, prepare a contractor-reviewed report, and support permit or inspection documentation where applicable. The assessment is processed and stored through the ElectricalService.ca, a division of A2Z Electric Inc. contractor portal. Access is limited to authorized users of the assigned contractor organization and authorized platform administrators. A short-lived one-way-derived connection counter limits automated abuse; the raw IP address is not stored in the assessment. Data is scheduled for deletion after 365 days unless a legal, contractual, safety, or active-project requirement calls for a different period.

To request access, correction, or deletion, or to withdraw consent subject to applicable restrictions, contact info@electricalservice.ca or (437) 9900080.

Pending contractor review: submitting this form does not mean the installation is approved or that electrical work may begin.